Gallery
gallary
gallary
testimonial
Analysing the makeup and quality of the air in indoor or outdoor settings is done through air quality testing.
This inspection aids in directing the sampling procedure and locating probable mould sources.
Lead paint is a latent risk. It typically doesn't present a problem if left alone.
ince the 1990s, asbestos has not been allowed to be used in the construction of buildings. But asbestos
Buildings in Burnaby and the surrounding areas can have their lead paint removed by Ace Environmental Services Ltd
Risk Assessment and Planning: Once asbestos is identified, a risk assessment is conducted to evaluate the potential
Mould remediation, commonly referred to as mould removal, is the process of locating, containing, and getting rid of mould growth in indoor settings.